Project
Type: Sewage Pumping Station Rehabilitation
Project Description
The project's sole objective is to fully rehabilitate the entire wastewater pump station in order to create a more
reliable and efficient pumping station. The pumping station was orginially constructed in the 1970's. The upgrades required
for this project include:
Installing new sewage pumps and variable frequency drives
Routing and re-routing
of existing and new sewage piping
Updating the electrical infrastructure
Installing a new surge control tank,
odor control center, and influent grinding system.
Upgrading the heating and ventilation equipment
Interior
and exterior architectural cosmetic makeover