Project Description:
American Contracting is currently under construction on the Noman M Cole
Jr., ENR Activated Sludge Tanks Modifications the following work will be completed: - Installation of a 48" high pressure aeration air pipe from the existing Blower
Building to the Activated Sludge Tanks.
- Installation of a new Methanol
Feed Piping system directed to the Activated Sludge Tanks.
- Installation
of a new pipe support system
- Installation of a new MCC at the Electrical
Building
- New Baffle Walls in the Activated Sludge Tanks along with new
tops to existing Baffle Walls.
- New Mixers and Mixer Platforms in the
Activated Sludge Tanks.
|