American Contracting constructed a complete new 700 square-foot water booster pump station including tie-ins to existing
water mains. We installed the underground force main piping, formed and placed the concrete foundation and slab on grade
for the new masonry building. We also self-performed the complete interior mechanical piping installation, including
the supply and installation of three water booster pumps with variable frequency drives. The work also included complete
electrical and instrumentation control systems.
Project highlights include:
Complete
construction of a new booster pump station
Process piping tie-ins to existing utilities with minimal shutdowns
Installation
of 800 linear feet of 8” DIP force main
Road work including lane closures and traffic control
Work on
a public golf course, public protection
Installation of three 7.5 HP horizontal centrifugal pumps with VFDs