The wastewater treatment plant includes an additional equalization tank and sludge holding tank hydraulically connected to the phase 1 tanks. There will be two (2) trains of bioreactor tanks that will have pre-anoxic, aerobic, and post-anoxic chambers. The control building will house the one (1) main skid, five (5) mini skids for membrane filtration, and chemical dosing equipment for supplemental carbon, caustic, and PACl. UV disinfection will also be included and sent out the building to the post-aeration tank and discharged through an effluent PS to a gravity outfall and force main.