Contract 23-A, General/Mechanical Construction: The Work includes the following detailed scope:
1. Demolition and removal of existing traveling bridge sand filter system, including tanks, pumps, filter media, metal tanks, valves, piping, andappurtenances inside the Filter Building.
2. Construction of concrete filter tanks, new grated walkways, and access stairs.
3. New cloth media disk filter system including filter media, pumps, drives,instrumentation, piping, valves, and appurtenances.
4. Concrete repairs and modifications to the existing Filter Building.
5. Integration of new filters into existing East Aurora WRRF SCADA system.