The project generally consists of:
- Process Drain and Influent Sampler Relocation
- Primary Sludge Degritter Replacement
- RAS and WAS Flow Metering Upgrades
- Replacement of Aeration Purge Blowers
- Replacement of Belt Filter Presses and Upgrades to Sludge Loadout
- Replacement of Process Water Pumps
- Slide Gate Replacements throughout the WWTP
- SCADA Upgrades throughout WWTP
- HVAC and Electrical Updates throughout WWTP
- Miscellaneous Concrete and Structural Repairs throughout WWTP
- Architectural Update to WWTP Building
- Site/Civil Improvements through WWTP