Bid Schedule Manassas Southside BPS Modifications
Bid Date
September 15th @ 2:00 PM
Project Location
8170 Blooms Quarry Lane, Manassas, VA 20111
Owner
PWCSA
Engineer
Hazen & Sawyer
Estimated Value
$1,000,000
The following is a general description of the project:
Horizontal Split-Case Pump Installation – Replacement of two existing horizontal split-case pumps with two new horizontal split-case pumps and installation of a third new horizontal split case pumps and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.
Pump Control Valves – Replacement of two existing pneumatic type pump control valves with two new 12-inch diaphragm pump control valves and installation of a third new 12-inch diaphragm pump control valve.
Electrical and Instrumentation – Installation of all electrical equipment and related work for the new horizontal split case pumps and pump control valves, installation of a new PLC, installation of a new Communications Panel (including all instrumentation equipment), installation of security equipment, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.
Structural – Replacement of three existing concrete equipment pads and placement of a fourth concrete pad for the new horizontal split-case pumps, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.
Piping – Installation of pump suction and discharge piping as required for the new horizontal split-case pumps and pump control valves, pipe supports, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.