Bid Schedule Manassas Southside BPS Modifications

Bid Date

September 15th @ 2:00 PM

Project Location

8170 Blooms Quarry Lane, Manassas, VA 20111

Owner

PWCSA

Engineer

Hazen & Sawyer

Estimated Value

$1,000,000


The following is a general description of the project:

Horizontal Split-Case Pump Installation – Replacement of two existing horizontal split-case pumps with two new horizontal split-case pumps and installation of a third new horizontal split case pumps and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.


Pump Control Valves – Replacement of two existing pneumatic type pump control valves with two new 12-inch diaphragm pump control valves and installation of a third new 12-inch diaphragm pump control valve.


Electrical and Instrumentation – Installation of all electrical equipment and related work for the new horizontal split case pumps and pump control valves, installation of a new PLC, installation of a new Communications Panel (including all instrumentation equipment), installation of security equipment, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.


Structural – Replacement of three existing concrete equipment pads and placement of a fourth concrete pad for the new horizontal split-case pumps, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.


Piping – Installation of pump suction and discharge piping as required for the new horizontal split-case pumps and pump control valves, pipe supports, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.